翻訳と辞書
Words near each other
・ Halenia weddelliana
・ Halenkov
・ Halenkovice
・ Halensee
・ Haleomyces
・ Halep
・ Halepa
・ Halepaghen Grammar School
・ Haler
・ Haler, Himachal Pradesh
・ Haleri Kingdom
・ Hales
・ Hales (disambiguation)
・ Hales (king)
・ Hales (surname)
Hales Bar Dam
・ Hales baronets
・ Hales Castle
・ Hales Corners Lutheran Church
・ Hales Corners, Wisconsin
・ Hales Formation
・ Hales Franciscan High School
・ Hales Gallery
・ Hales Grove, California
・ Hales Hall
・ Hales Island
・ Hales Island (Massachusetts)
・ Hales Island (Queensland)
・ Hales Limestone
・ Hales Peak


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Hales Bar Dam : ウィキペディア英語版
Hales Bar Dam

Hales Bar Dam was a hydroelectric dam once located on the Tennessee River in Marion County, Tennessee, United States. The Chattanooga and Tennessee River Power Company began building the dam in 1905 and completed it in 1913, making Hales Bar one of the first major multipurpose dams and one of the first major dams to be built across a navigable channel in the United States.
In 1939, the Tennessee Valley Authority assumed control of Hales Bar Dam after purchasing TEPCO's assets. TVA spent two decades trying to fix a leakage problem that had plagued Hales Bar since its construction, but after continued leakage, and after it was determined that expanding the dam's navigation lock would be too expensive, TVA decided to replace the dam by building Nickajack Dam downstream in 1968.〔Tennessee Valley Authority, ''The Nickajack Project: A Report on the Planning, Design, Construction, Initial Operations, and Costs'', Technical Report No. 16 (Knoxville, Tenn.: Tennessee Valley Authority, 1972), pp. 1-3, 10-11, 17-19, 307-311.〕
==Location and capacity==
Hales Bar Dam was located along the Tennessee River at just over above the river's mouth, near the southwest end of the Tennessee River Gorge. The dam's reservoir extended up the river through the gorge all the way to Chattanooga, and had of shoreline. Before the construction of Hales Bar, this was a particularly unpredictable and dangerous section of the river, with numerous navigation obstacles. Downstream from the dam site, the river begins to steady as it enters the hills and flatlands near Guntersville.
Hales Bar Dam was high and long, and its spillway had a combined discharge capacity of . After improvements by TVA in 1949, the dam had a generating capacity of 99,700 kilowatts. The dam's lock, which went into operation on November 1, 1913, was by , and its lift was the highest in the world at that time.〔〔Tennessee Valley Authority, ''The Melton Hill Project: A Report on the Planning, Design, Construction, Initial Operations, and Costs'', Technical Report No. 15 (Knoxville, Tenn.: Tennessee Valley Authority, 1966), pp. 6-7.〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Hales Bar Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.